For this irrigation rebuild project there are two 60 HP turbine pumps that lift 2500 gpm of water 80 feet to the settling basin where a 350 HP turbine lifts water 380 feet up the hill to a 250 HP booster pump which pushes the water the next 170 feet to a series of center pivots & wheel lines. Approximately 500+ acres are irrigated!

Below are some pictures and the step-by-step process from beginning to end!

Rebuild Project | Douglas Lake Deer Park, BC

This is the lift pump station which pumps the water from the Fraser River into the settling basin.

This view is the water draining into a concrete settling basin where the sediment from the Fraser River will settle out.

Rebuild Project | Douglas Lake Deer Park, BC
Rebuild Project | Douglas Lake Deer Park, BC

Settling basin set up near the Fraser River next to the pump station.

Inside the pump station at the settling basin.

Rebuild Project | Douglas Lake Deer Park, BC
Rebuild Project | Douglas Lake Deer Park, BC

This mainline runs up the hill from the pump house by the river to a booster pump which pushes the water to the pivots and wheel lines to irrigate the fields. Approximately 500+ acres are irrigated!